We had about 3 months remaining on our lease, so we decided to take that time to do some work to the new house. We didn't do a lot but we did a few things. The appliances were in terrible shape, so we replaced the range (went from electric to gas), oven, microwave, sink / faucets and refridgerator. We also had them take out the trash compactor and build a trash drawer that pulls out. We had the cabinets all stripped and painted, with new hardware. We added granite countertops with tile backsplash. We had the living room painted so that it was not that wood grain anymore. It lightened it up. We had a few ceilings scraped, removing the popcorn texture and then repainted. We had a little painting done, but the majority of the painting was done by Kristi and her mom. I wasn't trusted to wield a paintbrush.
Here is the kitchen, without cabinet doors, no countertops and appliances removed.

Here is the breakfast nook, stripped and ready to paint.

Kitchen again.

Here is the ceiling in the living room.

This is the ceiling in the breakfast nook.